Anqiu Huaan FRP Factory was established in Weixu Road, with a workshop area of 100 square meters.
12-10
2002
December 2002
Invest 200000 yuan in Guijiatuan Village, Liujiayao Town, to build 600 square meters of factory buildings.
06-15
2003
15 June 2003
Anqiu Dahua FRP Co., Ltd. was incorporated.
10-18
2005
October 2005
In Anqiu City, 20 acres of land was requisitioned to the south and west of Yanggan Road, and 1.5 million yuan was invested to build a new factory; in December 2005, the new factory was completed and put into operation.
06-09
2006
June 2006
Invested more than 100 million yuan to purchase a set of FRP sand pipe winding equipment, product quality, production efficiency has been greatly improved.
01-11
2007
January 11, 2007
Anqiu Dahua FRP Co., Ltd. took the lead in the same industry through the national ISO9001 quality management system certification.
05-20
2008
May 2008
Anqiu Dahua FRP Co., Ltd. was changed to Shandong Dahua FRP Co., Ltd.
02-18
2010
February 2010
Shandong Dahua FRP Co., Ltd. invested more than 300 million yuan to build a new set of PRF container integrated molding equipment, which timely solved the semi-manual composite material production process.
01-18
2011
January 2007
Obtain the qualification of "National Industrial Product Production License for Packaging and Containers of Hazardous Chemicals (Vertical and Horizontal)" licensed by Shandong Provincial Quality Supervision Bureau.
03-08
2011
March 2011
Shandong Dahua FRP Co., Ltd. has obtained the qualification of "National Industrial Product Production License for Water Pipes" licensed by Shandong Quality Supervision Bureau.
04-29
2011
April 29, 2011
Shandong Dahua Environmental Energy Saving Technology Co., Ltd. was incorporated.
12-15
2011
December 2007
Anqiu Dahua FRP Co., Ltd. has obtained the designated certificate of dangerous chemical packaging and container production enterprises approved by Shandong Safety Supervision Bureau.
11-30
2012
November 30, 2012
Shandong Dahua FRP Co., Ltd. has passed the national ISO14001 environment and OHSAS18001 occupational health and safety management system certification.
12-16
2013
December 2013
Invest in the newly-built factory area of Shandong Dahua Environmental Energy Saving Technology Co., Ltd., north of Anqiu Toll Station and west of 206 National Highway, with an investment of more than 7000 million yuan, 80 mu of land acquisition and a total construction area of 32000 square meters. The new production project of upper air cooler, evaporative condenser, closed cooling tower and wet electrostatic precipitator will be purchased, and advanced equipment such as hydraulic gate shearing machine, upper roller universal plate coiling machine and numerical control flame/plasma cutting machine will be officially put into operation in May 2015.
03-10
2014
March 2014
Shandong Dahua FRP Co., Ltd. was approved by the "Shandong Province involving drinking water hygiene and safety products hygiene license".
08-31
2015
August 31, 2015
Shandong Dahua Environmental Energy Saving Technology Co., Ltd. has obtained the certification of quality, environment and occupational health and safety management system.
02-01
2016
February 1, 2016
Shandong Dahua Environmental Energy Saving Technology Co., Ltd. obtained the "Radiation Safety License" from Weifang Environmental Protection Bureau.
05-17
2016
17 May 2016
Shandong Dahua FRP Co., Ltd. was authorized to use the "good product Shandong" logo.
12-12
2016
December 12, 2016
Shandong Dahua Environmental Energy Saving Technology Co., Ltd. has obtained the manufacturing license of D1/D2 pressure vessel special equipment issued by Shandong Quality Supervision Bureau.
12-13
2017
December 13, 2017
Shandong Dahua Environmental Energy Saving Technology Co., Ltd. has obtained the Grade III qualification of building mechanical and electrical installation engineering and environmental protection engineering professional contracting with the permission of Weifang Housing and Construction Bureau.